A fare collection RFP goes out, and three responses come back. All three vendors build for transit authorities running 400 vehicles. Each quotes an implementation plan built around integrations nobody at the agency asked for, priced for a fleet ten times the size of the one that requested it. None of the vendors who would actually treat a 20-bus agency as their target customer submitted. The RFP itself, written by copying language from a much larger system’s procurement document, quietly told them not to bother. The requirements section did the excluding. Nobody on the evaluation committee meant it to.
This guide covers what belongs in a fare collection RFP specifically. That means the sections, the requirements, and the language that narrows the field of responses without the agency ever choosing to. For general RFP structure, timeline, and submission mechanics that apply to any transit technology purchase, see how to write a transit technology RFP. This piece assumes that structure. It goes one layer deeper, into what a fare collection section should actually require, and what it should leave alone.
What Sections Does a Fare Collection RFP Need?
A fare collection RFP needs five core sections beyond standard procurement boilerplate: scope and current state, functional requirements, technical requirements, evaluation criteria with stated weighting, and submission instructions. Functional requirements get grouped by fare media, validation, back office, and reporting. Most small-agency RFPs are missing the current-state section, which is exactly where vendor eligibility quietly gets decided.
Scope and Current State
Before writing a single requirement, an RFP needs an honest inventory of where the agency stands today. This section does more procurement work than any requirement that follows it, because every vendor reading the RFP prices and scopes their proposal against it.
Document, at minimum:
- Fleet size and vehicle types, including any vehicles the agency plans to add or retire during the contract term.
- Fare media currently accepted, cash, tickets, passes, or an existing card system, and whether any of it needs to continue working during a transition period.
- Current back-office process, however manual, so a vendor understands what they are actually replacing rather than what a generic spec sheet assumes.
- Funding source and any grant conditions attached to the purchase, since a federal grant brings FTA’s third-party contracting requirements and reporting obligations of its own.
- Existing systems the fare solution must work alongside, including CAD/AVL, an accounting system, or a General Transit Feed Specification (GTFS) feed.
- Timeline drivers, such as a grant obligation deadline or a fiscal year budget cycle. State a real date rather than “as soon as possible.”
An RFP that skips this section forces every vendor to guess. A vendor pricing a guess prices conservatively. That shows up later as a higher bid, or as a proposal that assumes an integration the agency does not actually have.
Functional Requirements
Functional requirements describe what the system has to do, grouped by the parts of the fare experience a rider and a back-office staffer actually touch. Written as outcomes, not products, this section stays vendor-neutral while still being specific enough to evaluate.
Fare media. State which payment types riders must be able to use: a reloadable contactless card, barcode or QR ticketing, mobile wallet payment, and cash through a farebox. A farebox still matters for riders without a smartphone or a bank account. Require the fare media the agency’s ridership actually needs, not every fare media type that exists.
Validation. Specify how a fare gets validated at boarding, including read speed a driver can live with on a tight schedule, and what happens when a validator loses connectivity. A validator that cannot function offline is a real operational risk on a rural route with known coverage gaps, and that requirement belongs in the RFP explicitly.
Back office. Cover reconciliation, settlement, refunds, and how fare products, passes, discounts, transfers, get configured and changed without a vendor service ticket for every update.
Reporting. Require exports that match what the agency already has to produce. That means ridership and revenue data structured for National Transit Database (NTD) reporting and an audit trail for every transaction. It also means a reconciliation report that ties fare revenue to what actually landed in the bank.
Technical Requirements
Technical requirements cover how the system fits into everything around it, not what it does on its own.
- Integration. State every system the fare solution has to connect to: CAD/AVL, a GTFS feed, a finance or general ledger system, and the format each integration should use.
- Data ownership. The agency’s transaction and rider data belongs to the agency. Require export rights to the agency’s own data, in a usable format, on a stated schedule, not only at contract termination.
- APIs. Require, at minimum, an API or scheduled export for revenue and ridership data. An agency that cannot get its own data out of a system it is paying for has bought a dependency, not a tool.
- Offline behaviour. Require the RFP response to state what happens to a transaction when connectivity drops mid-trip. It should be stored locally and synced when the connection returns, with no lost revenue and no lost ridership count.
How to Avoid Specifications That Quietly Exclude Small Vendors
This is the section worth reading twice. Most small-agency RFPs get built by adapting a document from a larger system, a peer agency, or a state boilerplate. Writing procurement language from nothing is slow, and nobody wants to be the reason a purchase gets delayed. The problem is that language written for a 400-vehicle system carries assumptions that have nothing to do with functional need. Those assumptions come from the size of the agency that originally wrote them. Copied forward, they become requirements that eliminate every vendor sized to serve a 10 to 50 vehicle agency well. They do nothing to improve the system the agency ends up with.
| What gets copied from a large-agency RFP | What it actually excludes | What to write instead |
|---|---|---|
| “Vendor must have a minimum of 200 currently deployed validators across at least three transit authorities operating 300 or more vehicles each.” | Any vendor whose customer base is agencies under 50 vehicles, even one with hundreds of validators deployed across dozens of smaller systems. | “Vendor must demonstrate current production deployments with references from at least two agencies of comparable fleet size.” |
| “Vendor must maintain a 24/7 staffed regional field service office within 50 miles of the agency’s operating base.” | Vendors who serve a distributed customer base through remote diagnostics and shipped hardware replacement, which is how most small-agency-focused vendors operate profitably. | “Vendor must commit to hardware replacement or on-site service within a stated number of business days, documented in a service level commitment.” |
| “Proposer must carry a minimum of $10,000,000 in commercial general liability insurance.” | Smaller, financially sound vendors carrying insurance scaled appropriately to a contract a fraction of that size. | Insurance and bonding requirements sized to the actual contract value, reviewed against the agency’s own risk and legal counsel, not copied from a document written for a contract ten times larger. |
| “Vendor must have minimum annual revenue of $50 million and a minimum of 20 years in business.” | Newer or smaller vendors with a strong product and a customer base of agencies exactly this size, screened out before the technical proposal is ever read. | Financial health verified through references, a Dun and Bradstreet report, or a bank letter, evaluated against the size of the purchase rather than an arbitrary revenue floor. |
| “System must integrate with [a specific enterprise CAD/AVL platform]” copied from a peer agency’s spec sheet. | Any vendor who integrates through an open standard instead of that one named platform, even when the agency does not run that platform itself. | Name the actual system the agency runs, or specify the open standard, GTFS-RT for example, the integration should use. |
None of this means lowering the bar. It means writing the bar around what the purchase actually needs, so the vendors who compete are the ones who can genuinely deliver it. Choosing a fare collection provider covers what to evaluate once the field of qualified respondents is the right one.
Evaluation Criteria and Weighting
State evaluation criteria and their weighting in the RFP itself, before any proposal arrives. Federal rules at 2 CFR 200.320 require a request for proposals to identify all evaluation factors and their relative importance. A committee that decides weighting after reading the proposals is deciding based on which vendor it already prefers. That is exactly the kind of process a losing bidder can successfully protest.
Here is one example split for a fare collection purchase. Technical approach and functional fit at 40%, price at 30%, vendor experience and references at 20%, and transition or implementation plan at 10%. The right split depends on what matters most for a given agency. Decide and publish it before the RFP goes out, not afterward, to fit whichever proposal the committee liked best.
What to Leave Out
An RFP can add cost and risk without adding value. Leave out:
- Implementation detail that belongs to the vendor, not the buyer. Requiring a specific database technology or server architecture describes how, not what. It narrows the field without improving the outcome.
- Bonding or insurance levels sized for a construction contract. A performance bond sized for a multi-million-dollar public works project adds cost to a technology purchase. It adds no protection that matches the actual risk.
- Fare media or integration standards the ridership and systems will never use. A fare media standard built for a large multi-operator region adds nothing when an agency runs one fixed route network.
- A proprietary data format requirement, deliberate or not. Requiring export “in the vendor’s standard format” instead of an open format locks the agency into whichever vendor wins. That holds regardless of what the contract says about ownership.
Every line in an RFP either narrows the field toward the right vendor or narrows it away from one. Reading each requirement and asking which it does, before the RFP goes out, is the cheapest quality control step available.
TransitFare is a transit technology company founded in 2012 that builds Automated Fare Collection for transit agencies running 10 to 50 vehicles across North America. Over 90% of customers expand to additional modules. Deployments typically take about 12 weeks including hardware, and the platform has processed 60 million+ fare validations with a strong production reliability record. None of that is a reason to write a requirement around any single vendor. It is context for why the requirements above are written from the buyer’s side, not a seller’s.
Writing every section above from scratch is still real work. National RTAP’s procurement guidance is a good starting reference for agencies without a dedicated procurement office. Download the RFP template built around this structure, with fare collection requirements, evaluation weighting, and reference check questions already drafted. A small agency’s next fare collection procurement can start from a document built for it, instead of one adapted from a document that wasn’t.