An agency planning a bus replacement or a zero-emission transition is already assembling a capital application, and that application is the natural place to fund the technology going on those buses. Section 5339 funding covers buses “and related equipment,” and onboard technology is related equipment. A fare validator, a tracking unit, an automated passenger counter, or the edge gateway that runs them can ride along on the same grant as the vehicle. The alternative is waiting for a separate funding request that may never come.
The mistake worth avoiding is treating the technology as an afterthought bolted on late, or worse, as a separate application filed a year later at full cost to the local budget. Done right, the technology is written into the vehicle’s capital scope from the start, funded at the same federal share as the bus itself.
What Is Section 5339 Funding, and What Does It Cover?
Section 5339 funding covers capital costs for buses and bus facilities: purchasing and rehabilitating vehicles, building and improving maintenance and passenger facilities, and the equipment related to them. It is capital-only, with no operating component. Onboard technology installed as part of a bus purchase, including fare collection, tracking, and passenger counting hardware, falls inside the “related equipment” category the program funds.
5339(a) Formula Versus 5339(c) Low-No
Section 5339, codified at 49 U.S.C. 5339, runs on more than one track, and the difference decides how an agency applies. The 5339(a) formula program apportions funds by formula to states and designated recipients, similar in structure to the larger urbanized and rural formula programs. An agency draws on its apportionment on its own project-readiness timeline rather than winning a national competition.
The 5339(c) Low or No Emission program, usually called Low-No, is different in kind. It is a nationally competitive discretionary program for zero-emission and low-emission buses and the facilities that support them, awarded through a notice of funding opportunity (NOFO) each cycle. There is also a competitive 5339(b) Bus and Bus Facilities program for buses and facilities more broadly. The practical split for a small agency: formula 5339(a) funds are more reliable but modest, while the competitive Low-No and Bus and Bus Facilities rounds offer larger awards against national competition and a heavier application. Which FTA grant pays for transit technology sets 5339 next to the other formula sources an agency of this size can reach.
What “Related Equipment” Covers
The phrase that makes 5339 useful for technology is “related equipment,” and it is broader than many applicants assume. Equipment installed on or serving the funded vehicle is generally eligible alongside it.
- Fare collection hardware. Validators and fareboxes installed as part of the vehicle build.
- Real-Time Tracking and CAD/AVL hardware. The onboard unit that reports location and drives dispatch.
- Automated Passenger Counting sensors. Door-based counters installed with the vehicle.
- The onboard edge gateway. The single box that runs the modules above, which is where a bundled purchase is cleanest.
- Zero-emission support equipment. For a Low-No project, EV telematics and charging-related equipment tied to the buses.
The dividing line is the same one that decides eligibility across FTA capital programs. Is the item capital equipment attached to the vehicle or facility, or a standalone recurring service with no vehicle to attach to? A validator installed on a new bus is unambiguously related equipment. A software-only subscription with no hardware in the order has no vehicle to ride along on, and does not fit a capital-only program. Capital budget or operating budget walks through how that line gets drawn when a purchase mixes both.
The NOFO Cycle and Set-Asides
The competitive Low-No and Bus and Bus Facilities programs open through a NOFO on a yearly cycle. Totals and dates change every year, so the governing detail is always the current NOFO on the FTA Bus and Bus Facilities program page, not a figure remembered from a prior cycle.
One set-aside is worth planning around specifically. Zero-emission bus projects must dedicate at least 5% of the award to workforce development and training, unless the applicant certifies that a smaller share meets its needs. That line has to appear in the application’s cost breakdown from the start. An agency that discovers the 5% requirement after building its budget has to rework the whole request. Build it in at the scoping stage instead.
Writing Technology Into a Capital Scope
The framing that keeps a technology line from drawing scrutiny is to present it as part of the vehicle, not as a separate ask riding on the same form. A new bus specified with its fare, tracking, and counting equipment as installed components reads as one coherent capital project. The same equipment listed as an unexplained add-on invites the reviewer to ask why it belongs. A scope of work for onboard hardware covers how to write those components so an installer and a reviewer read them the same way.
Two constraints shape the scope. First, a federally funded procurement above the small purchase threshold carries Buy America requirements under 49 U.S.C. 5323(j), which any RFP built against grant funds has to address directly. Buy America and transit hardware covers what that means for the components in an onboard package. Second, vehicle eligibility and facility eligibility are separate categories within 5339. Onboard technology attaches to the vehicle side. Equipment for a garage or maintenance facility, such as charging infrastructure or shop diagnostic tools, sits on the facility side, with its own justification. Mixing the two in one line without distinguishing them is a common source of reviewer questions.
Pairing 5339 With 5307 and 5311
Section 5339 rarely stands alone. An agency in an urbanized area typically pairs it with Section 5307 formula funds, and a rural agency reaches capital equipment through Section 5311, routed through the state. A common and workable structure is to fund the buses and their installed technology under 5339 or Low-No, while using 5307 or 5311 for the software modules and services that are not vehicle-attached capital. The programs are complementary, not mutually exclusive, and coordinating them lets an agency fund a complete deployment without forcing every piece into one program it does not fit. Confirm the split with the state DOT or designated recipient before assuming a given cost lands in a given program.
FAQ
Can Section 5339 Pay for Software, or Only Hardware?
Section 5339 is capital-only and funds buses, related equipment, and facilities. Onboard hardware installed with a vehicle fits cleanly. A standalone software subscription with no vehicle attached does not, because the program has no mechanism for a recurring operating cost. Fund the hardware under 5339 and the software through a program that allows it.
Is Low-No Only for the Buses Themselves?
No. The Low or No Emission program funds zero-emission and low-emission buses along with supporting facilities and related equipment, including the onboard and charging equipment tied to those vehicles. For zero-emission projects, the workforce development share also has to be budgeted in the application.
What Federal Share Does Section 5339 Provide?
Capital projects under Section 5339 generally carry up to an 80% federal share with a 20% local match, the same structure as other FTA capital programs. Certain zero-emission and accessibility-related components can carry a higher share in specific cases. Confirm the current figures against the applicable circular and the active NOFO before budgeting.
When Are Low-No Applications Due?
The competitive programs open through a yearly NOFO, and the date changes every cycle. Always work from the current NOFO on the FTA Bus and Bus Facilities program page rather than a date carried over from a prior year.
Where TransitFare Fits
TransitFare is a transit technology company founded in 2012 that builds Automated Fare Collection, Real-Time Tracking, and Automated Passenger Counting for small and mid-sized transit agencies running 10 to 50 vehicles. The onboard modules run on the TF4 Edge Gateway, a single box that fits a bus capital scope as related equipment rather than as several separate line items. Deployments that include onboard hardware typically go live in about 12 weeks. The platform has processed 60 million+ fare validations, with trusted partnerships spanning over a decade. Talk to us about your agency if you are scoping technology into a bus purchase, or start with the full funding and procurement hub for how the grant connects to the purchase that follows it.