The demo ran an hour and covered every feature on the sheet. The screens looked clean, and the sales rep answered every question asked. Nobody in the room asked what happens to the agency's data if the contract ends. Nobody asked who owns the reconciliation report at 6 AM when a driver calls in a discrepancy. No one asked what a rate increase looks like in year three. Those turned out to be the only questions that mattered. A transit technology vendor evaluation is supposed to catch that before signature, not six months after.
A real evaluation is not a feature comparison. It is a structured way of finding out what a vendor’s marketing page does not say, before a signature makes it the agency’s problem to discover later. It draws on the same ground FTA’s procurement guidance covers for federally funded purchases and National RTAP’s procurement guidance covers for agencies without a dedicated purchasing office, distilled into questions any agency can ask directly. This is a printable checklist. Thirty questions in five groups, what a good answer sounds like for each, and a scoring method to compare vendors on paper instead of on memory. Run it against every vendor an agency is evaluating, TransitFare included.
What Is a Transit Technology Vendor Evaluation?
A transit technology vendor evaluation is a structured set of questions covering capability fit, integration and data ownership, contract terms across the whole term rather than year one, support response at the hours a bus actually breaks down, and what happens if the agency ever leaves. It belongs on paper, scored, not carried around as an impression from a demo.
Most demos cover capability well and the other four groups barely at all. That gap is exactly where a vendor relationship goes wrong after the contract is signed.
Capability Fit
Six questions on whether the product actually does the job, not just the job the sales deck describes.
1. Does This Handle Our Exact Fleet Size, Not a Scaled-Down Enterprise Product?
A good answer names the range of fleet sizes the vendor actually supports today and where the product was originally built for. A vendor whose smallest reference agency runs 200 vehicles is describing a scaled-down version of something else, not a product built for 10 to 50 buses.
2. What Does the Product Not Do Today?
A good answer states a real limitation plainly and names a roadmap date, or says there is none yet. A vendor with no gaps to name has not been asked this question honestly before.
3. Which of Our Current Workflows Would Have to Change?
A good answer walks through the agency’s actual dispatch or fare workflow, step by step, and says where it changes. A vague answer here means the product has not been mapped to how this agency actually runs.
4. Can We See This Running at an Agency Our Size, Live, Not in a Sales Environment?
A good answer is yes, with a reference agency willing to take a call without the vendor on the line. Hesitation here is itself the answer.
5. What Hardware Does This Require, and Do We Already Own Any of It?
A good answer is specific about model numbers and compatibility, not a general claim of flexibility. Destination sign and APC sensor integrations are either named specifically, or they are not real integrations yet.
6. How Does This Module Work If We Only Buy This One, Not the Whole Suite?
A good answer describes a standalone deployment with its own value on its own. A vendor who cannot answer without mentioning three other modules is selling a bundle, not a module.
Integration and Data
Six questions on where the data lives and who can reach it.
7. Who Owns the Data This System Generates?
A good answer states plainly that the agency owns its own ridership, fare, and location data, in writing, not implied by a general terms of service.
8. Can We Export Our Data in a Standard Format, on Demand, Without a Support Ticket?
A good answer names the format, GTFS or a documented API, and describes self-service export. If export requires a support ticket and a wait, that is the honest answer to write down.
9. Does This Integrate With Our Existing GTFS Feed and Our Other Systems?
A good answer confirms standards-based integration, GTFS and GTFS-Realtime specifically, not a proprietary format that locks the agency into that vendor’s own downstream tools.
10. What Happens to Historical Data If We Switch Systems Later?
A good answer describes a defined export and migration process. An answer that has never come up before is a warning sign, not a compliment to how rarely agencies leave.
11. How Does This System Handle a Lost Connection in the Field?
A good answer describes what happens on a rural route with a weak signal. Data should queue and sync once the connection returns, not fail silently until someone notices.
12. Who Can See Our Data, and Where Is It Hosted?
A good answer names the hosting environment and the access model plainly, including whether the vendor’s own staff can view agency data and under what circumstances.
Contract and Commercial
Six questions on what is actually being signed, not what is being pitched.
13. What Is the Full Cost Across the Contract Term, Not the First Year Alone?
A good answer gives a number, or a clear formula, covering support, upgrades, and any hardware refresh across at least 3 years. A quote covering year one alone is not a complete answer.
14. What Triggers a Price Increase, and by How Much?
A good answer states the mechanism plainly: a fixed annual cap, a renewal negotiation, or something else specific, not a vague reference to market conditions.
15. What Is Included in the Base Price, and What Is Billed Separately Later?
A good answer lists what is genuinely included versus what shows up as a change order six months in. A vendor who cannot separate the two clearly has not separated them internally either.
16. What Is the Minimum Contract Term, and What Happens If We Need to Exit Early?
A good answer states the term and the exit terms plainly, including any penalty, rather than assuming the question will not come up.
17. Who on Our Side Is Actually Reviewing and Approving This Contract?
This one is a process question, not a vendor question. A good internal answer names a specific person with the authority to say no, not a committee that meets once a quarter.
18. Does the Contract Reference Specific Service Levels?
A good answer points to a defined service level agreement with response times attached to it, not marketing language repeated inside the legal document.
Support and Operations
Six questions on what happens after the sale, when something actually breaks.
19. What Does Support Look Like at 6 AM When a Driver Calls in a Problem?
A good answer names who answers, how fast, and through what channel. A general claim of round the clock coverage with no detail behind it is not a real answer.
20. How Is a Fare Rule Change Made, and by Whom?
A good answer describes whether agency staff can make the change directly, or whether it requires a vendor ticket, and how long that ticket typically takes.
21. What Does the Reconciliation Report Actually Look Like?
A good answer is a real sample report, by route and by day, that a finance director could hand to a board without reformatting it first.
22. How Are Software Updates Delivered, and Do We Have Any Say in Timing?
A good answer describes a predictable release cadence and whether an agency can delay an update around a busy service period.
23. What Reference Agencies of a Similar Size Can We Talk to, Specifically?
A good answer offers names and lets the agency ask about support quality directly, not just product features covered in the demo.
24. What Happens During a Regional Outage or a Major Weather Event?
A good answer describes a tested continuity plan, not an assumption that a cloud provider’s own uptime already covers everything that could go wrong.
Exit
The group nobody asks and everybody should. Six questions on the day this vendor relationship ends, however it ends.
25. What Does the Exit Process Actually Look Like, Step by Step?
A good answer walks through data export, hardware disposition, and a transition timeline without hedging. A vendor that has never written this down has never planned for it either.
26. How Long Does a Full Data Export Take, in Practice?
A good answer gives a real number of days, based on a prior case, not a promise that it will be handled promptly whenever it is asked for.
27. Do We Own the Onboard Hardware, or Is It Leased and Subject to Removal?
A good answer states ownership plainly. Leased hardware that must be removed on exit changes the real cost and timeline of leaving.
28. What Happens to Rider Accounts and Balances, Like a Mobile Wallet, If We Switch Vendors?
A good answer describes how rider balances are protected or migrated. Riders should never lose money because the agency changed vendors.
29. Is There a Contractual Penalty for Leaving Before the End of the Term?
A good answer states the number, beyond the standard notice period, if one exists, rather than describing a penalty as unlikely to come up.
30. Would This Vendor Help Transition Us to a Competitor If We Asked?
This question rarely gets a fully honest answer in the room. The hesitation before the answer is itself the data point worth writing down.
How Do You Score the Answers?
Score each of the thirty questions on a three-point scale: 2 for a specific, verifiable answer, 1 for a vague or partial answer, and 0 for no real answer or a dodge. Total each group out of 12 and the full checklist out of 60. A vendor scoring under 8 in any single group has a real gap in that area, regardless of how the other four groups score. That is especially true of the exit group.
A high total score with one group near zero is not a passing evaluation. It is a specific risk the agency is choosing to accept, and it should be named as a decision, not discovered later. Print the scorecard, bring it to every demo, and fill it in during the meeting rather than from memory afterward. A vendor’s own discomfort with a specific question is data worth writing down too.
Run This on TransitFare Too
This checklist was written to work against any vendor, and that includes TransitFare. Ask about the fleet size range, the export format, the full contract term cost, the 6 AM support path, and the exit process exactly as written above. Expect specific answers to every one, not a general reassurance.
TransitFare is a transit technology company founded in 2012 that builds a modular platform for agencies running 10 to 50 buses, and the honest test of that claim is whether it survives this exact checklist, not whether it sounds good in a demo. The same platform behind 60 million+ fare validations processed deploys a fare collection module in roughly 12 weeks including hardware, or about 4 weeks for a software-only module, figures a reference agency can confirm directly rather than take on faith.
FAQ
How Long Should a Transit Technology Vendor Evaluation Take?
Long enough to complete a live reference call and a real demo answering these thirty questions. For a small agency team working it alongside regular duties, that typically runs 2 to 4 weeks. Rushing past the exit and contract groups to hit a budget deadline is where evaluations go wrong, not the capability questions everyone already asks.
Who Should Be in the Room for a Vendor Evaluation?
At minimum, whoever owns daily operations and whoever owns the budget. Capability questions and contract questions get weak answers when asked separately. A finance director asking the contract group alone, without an operations voice asking the capability group, misses how the two interact in practice.
Should We Score Every Vendor With the Same Thirty Questions?
Yes, using the identical list and the identical scoring scale, or the comparison is not real. A different question set for each vendor produces scores that cannot be compared on the same table when the decision actually gets made.
What If a Vendor Cannot Answer the Exit Questions at All?
Treat that as a finding, not an oversight. A vendor who has never had to answer how an agency leaves is a vendor who has not had to plan for it, which is itself useful information going into the negotiation.
Is a Low Price Ever a Reason to Skip Parts of This Checklist?
No. A lower first-year price paired with a weak answer on contract escalation or exit terms often costs more over the full term than a higher quoted price with strong answers in those same two groups. Read the RFP guide for how to structure a request that surfaces this comparison before signature, not after.
Take It Into the Next Demo
Thirty questions, five groups, and a score out of 60 turn a vendor evaluation from a feeling in the room into a number the whole team can compare later. Download the RFP template to build these questions into a formal request. Read the fair comparison of all-in-one platforms and point solutions if capability fit is the open question, or see how fare collection vendors specifically should be evaluated before the next meeting. See the platform, then put these thirty questions to TransitFare too.